Glossary of Terms

If you do not understand any of the terms or acronyms used on this site please refer to the glossary below:

A

5S or 5C

Method of good housekeeping made up of 5 disciplines - for example; sort, straighten, sweep, standardise and sustain.

5 why's

Method finding the root cause of a problem by asking "why?" a number of times and structuring the possible causes in a hierarchical event tree.

Art of War (The)

Writings by Sun Tzu 500BC on warfare adapted today by many writers to develop business strategies. See The Way of the Leader by Donald G Krause.

back to top


B

Batch production

The production process whereby products/components are produced in batches and where each separate batch consists of a number of the same products.

back to top


C

Capability

A method for determining if a process is able to work with specified tolerances measured by Cpk values.

Cause and effect

A method for finding the root cause of a problem. Using a cause and effect diagram also called fishbone diagram or Ishikawa diagram.

back to top


D

Design of Experiments (DOE)

A rigorous method of simultaneously varying experimental factors and then mathematically determining the effect each factor had on the result. An efficient and fast method for running experiments.

DMAIC

An acronym of; Define, Measure, Analyse, Improve, Control - a methodology used in six-sigma projects.

back to top


E

External work

Work that is undertaken outside of a set-up procedure.

back to top


F

Facilitator

A leader of a Kaizen event/lean workshop. One who guides and facilitates the team.

back to top


G

Gauge R&R

A method for determining if a measuring system of repeatable and reproducible.

back to top


H

Hidden Waste

Work that does not add value but is required under the current operating conditions.

Hoshin Kanri

Strategy deployment method for translating company strategy in to clear goals and measures and tracking them through to deployment of actions.

back to top


I

Internal work

Work that is undertaken inside the set-up time.

Inventory

Inventory=Stock: Inventory conceals problems, makes control difficult and obscures the opportunity for improvement.

back to top


J

JIT

Just-in-time manufacturing. The art of producing just what is needed, when it is needed.

back to top


K

Kaizen

Pronounced Ky'zen means gradual unending improvements or continuous improvement.

Kanban or Kamban

A flag or system to say when stock needs to be reordered and used in just-in-time production systems.

back to top


L

Lean

Word used to describe processes with no waste. See Lean Thinking - Banish waste and create wealth in your corporation by James P Womack and Daniel T Jones.

Learning Organisation

Book by Robert H Hayes et al called Dynamic Manufacturing - Creating a learning organisation and the Fifth Discipline - The Art & Practice of The Learning Organisation by Peter M Senge.

Line balancing

Where each operation in a process is designed to take the same time and balanced to meet the customer Takt time.

back to top


M

Machine that Changed the World (The)

Book on the lean production revolution in the automotive industry by James P Womack et al.

MRP

Material Requirement Planning.

Muda

Japanese for waste.

back to top


O

Obvious Waste

Work that does not add value and is not necessary: Overproduction, Waiting, Transportation, Process, Inventory, Operator Movements, Defects.

One-Piece-Flow

One piece flow or single piece flow means a batch size of 1 in a production system.

back to top


P

Pareto

A philosophy that says 80% of the problems are caused by 20% of the issues. By arranging the problems in descending order allows selection of the top few items causing most of the problems. A method for prioritising improvement activities.

PDCA Cycle

Plan Do Check Act continuous cycle for developing and improving things. Also called the Deming cycle.

Poka Yoke

Poka Yoke means mistake-proofing and is a method made popular by Shigeo Shingo in his book Zero Quality Control: Source Inspection and the Poka Yoke System. A Poka Yoke device will either warn of a failure or stop the process so the failure cannot be passed to the process step.

back to top


S

Set-up time

The time from the last good piece of batch A to the first good piece of batch B.

Six-sigma

A data centric problem solving set of tools aimed at reducing variation and waste in processes. Uses the DMAIC (Define, Measure, Analyse, Improve, Control) methodology to improve complex problems using data to guide and confirm solutions. The exponents of six-sigma a graded; yellow belt, green belt, black belt and master black belt.

SMED

Acronym for Single Minute Exchange of Dies first used by Japanese author Shigeo Shingo see his book A revolution in Manufacturing: The SMED System. SMED is a quick tool change methodology.

Standard Operations

A method of capturing the current method of operating a process or carrying out a task to create consistency and repeatability.

Statistical Process Control (SPC)

A method of tracking a process through data to establish if it is in control.

Statistical Process Control PRE-control

A simplified method of tracking a process through data using tolerance limits to establish if it is in control.

back to top


T

TAKT Time

Takt Time is the desired time between units of production output, synchronized to customer demand. "Takt" is the German word for the baton that an orchestra conductor uses to regulate the speed, beat or timing at which musicians play. So Takt Time is "Beat Time"? "Rate Time" or "Heart Beat".

TPE or OEE

Total Productive Effectivness or Overall Equipment Effectivness is a measure of Availability Rate x Performance Rate x Quality Rate.

TPM

Total Productive Maintenance aims at maximising equipment effectiveness throughout the entire life of the equipment - a cleaning and continuous maintenance regime.

TQM

Total Quality Management. A product-quality program in which the objective is complete elimination of product defects. Originated by Deming in the 1950's, and widely applied in the Federal government, where it was sometimes called Total Quality Leadership (TQL).

back to top


V

Value Added Work

The part of the job the customer wants to pay for.

Value Stream Mapping (VSM)

A tool for mapping a process with metrics on inputs and outputs at each stage of the process. An enhanced form of process mapping.

Voice of Customer (VOC)

General term relating to capturing customer needs and wants. Some sophisticated tools have been developed to capture the voice of the customer and translate then in to measurable deliverables.

back to top


W

Waste

Non-value adding activities that are not necessary. Muda in Japanese.

Warusa-kagen

A term meaning things that are not yet problems, but are still not quite right.

Workflow

The flow of work through a process. Should be smooth and without waste or interruptions. Related to one-piece flow and line balancing.

Workshop

A team based improvement activity lasting typically 2 to 5 days. Also known as a Kaizen blitz or lean event.

back to top


A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z